Saturday, November 28, 2009

Free Blueprints To Build Playset



PLEASE
READ THIS DOCUMENT CAREFULLY

UNTIL THE END.

NE VA HEALTH OF THE POPULATION OF 30 COMMON


between the provinces of Ancona and Pesaro-Urbino.

WE ALL INCLUDING





SUSTAINABLE DEVELOPMENT Valcesano


ABOUT

A group of citizens of the towns of Corinth and Mondavio which is free to understand what the project of the new Central gas turbines from 870Mwe filed by Edison SpA in the Marche Region and the Ministry of Productive Activities.

www.valcesanosostenibile.org



+------------------------------------- -------------------------------------------------+

WHY 'WE CALL SUSTAINABLE DEVELOPMENT

Because we believe that the growing energy needs can be filled in a manner consistent with the needs of protection and conservation of resources and achieving a level not harmful to the environment' humans and other living species.



+--------------------------------------------- -----------------------------------------+

Edison SpA plans
to build in the valley of the River Cesano
power plant gas turbines capable of generating
870Mwe electricity and
issue huge amounts of toxic substances

the environment and people.



+--------------------------------------------- -----------------------------------------+

The power station will be a
methane (will use more than 1 billion cubic meters of gas per year)
through a pipeline that passes
Monterado


To cool the plant will be used annually

about 80 000 cubic meters of water
( taken from the basin of Cesano)


WITH NEGATIVE CONSEQUENCES
FOR AGRICULTURE AND LAND


+------------------------------------- -------------------------------------------------+

The central
occupy an area of \u200b\u200bapproximately 6 hectares and the chimneys

reach a height of 50 meters. The only building


cooling will be 34 meters high.



+--------------------------------------------- -----------------------------------------+

A power line 60 meters high
17 km long and will cross the towns of

Monte Porzio, S. Giorgio di Pesaro, Piaggio, and Cartoceto
arrive at Fano, where electricity
will be conveyed
axis national Fano-Teramo.


FIREPLACES WILL BE EXPELLED FROM EVERY YEAR


2,555,924 TONS OF CARBON DIOXIDE (CO2)


THE TOXIC FUMES MAY ALSO DISPOSE 100-200km FROM CENTRAL


+----------------------------------------------- ---------------------------------------+

19 municipalities in the province of Pesaro Urbino-

that will be affected so profoundly negative

Mondavio, Monte Porzio, pitchers of Pesaro, S. Giorgio di Pesaro, Piaggio, Fano, Monte Major at Metauro Mondolfo, S. Costanzo, Barchi, Fratte Rosa, S. Lorenzo in Campo, Pergola, Isola del Piano, S. Ippolito, Fossombrone Cartoceto Saltara, Serrungarina.


+--------------------------------------------- -----------------------------------------+

11 municipalities in the province Ancona
that suffer the same consequences

Corinaldo, Castelleone Suasa, Barbara, Arcevia, Ripe, Castelcolonna, Monterado, Senigallia, Ostra, Ostra Vetere, Montecarotto.



+--------------------------------------------- -----------------------------------------+

EDISON PROJECT

LOCATION



+----------------------------------------- ---------------------------------------------+

IL EDISON PROJECT

The pipeline




+--------------------------------- -------------------------------------------------- --- +

EDISON PROJECT

The projected


+------------------------- -------------------------------------------------- -----------+

EDISON PROJECT

The projected

+----------------------------------------------- ---------------------------------------+

EDISON PROJECT


A COMPARISON


+---------------------------------------- ----------------------------------------------+

THE EDISON PROJECT

VIEW (RENDER)



+---------------------------- -------------------------------------------------- --------+

EDISON PROJECT OVERVIEW

(RENDER)


+------------------ -------------------------------------------------- ------------------+

EDISON PROJECT

SIZE

area occupied by the central 6.2 hectares

Building Height: 12-28 feet

Building Cooling area 8000 square meters, height 34 meters

+------------------------------------------- -------------------------------------------+

NUMBERS

Operating period: 8170 hours / year

Period of detention: 590 hours per year

+----------------------- -------------------------------------------------- -------------+

CONSUMPTION

annual consumption of methane : 1,307,000,000 cubic meters of methane

annual energy output: 7,117 gigawatt hours (GWh)

Efficiency: 56.8 %



+------------------------------------------- -------------------------------------------+

CONSUMPTION

annual consumption of water: about 80,000 cubic meters


waterworks From: 4,200 cubic meters per year

From Fire Zipa Network: 75,000 cubic meters per year

+-------------------------------------- ------------------------------------------------+

NUMBERS

FLOW OF TWO GAS FIREPLACES: 5,110,400 cubic meters per hour

weight of fumes: 4,864 tons per hour

fine particles (PST): INCONSIDERABLE (???)

+-------------------------------------- ------------------------------------------------+

annual emissions PROVIDED

monoxide, nitrogen oxides (NOx): 196 tonnes / year

Carbon monoxide (CO): 1,179 tons / year

Carbon dioxide (CO2): 2,555,924 tons / year

+ --- -------------------------------------------------- ---------------------------------+

thermal emissions
Airborne

Produced by two generators: 311 Megawatt thermal (MWth)

Produced by the capacitor: 500 Megawatt thermal

+----------------------- -------------------------------------------------- -------------+

thermal emissions

temperature of the smoke emitted from the two chimneys: 89/90 ° C

speed of the smoke emitted from the two chimneys: 20 meters / second


+----- -------------------------------------------------- -------------------------------+

The noise

Increased noise at night: 15/17 + Decibel

increase daytime noise: + 1 / 4, 5 Decibel

+-------------------------- -------------------------------------------------- ----------+

TIMES REALIZATION

electroduct: 8 months

methane: 15 months

Central: 30 months


+---------- -------------------------------------------------- --------------------------+

LABOUR

labor required for the site: 600/700 people

labor force to work: 22 people

or temporary labor contracts: 25 people

+------------------------------------------ --------------------------------------------+

SAY NO TO CENTRAL TURBOGAS